CA Class A License No. 767055 | CA-DIR 1000004169 • ID: RCE-56388 • ND: 49214 • NV: 0078739 • UT: 11795539-5501 • VA: 2705154065 • WA: 604-625-160
CA Class A License No. 767055 | CA-DIR 1000004169 • ID: RCE-56388 • ND: 49214 • NV: 0078739 • UT: 11795539-5501 • VA: 2705154065 • WA: 604-625-160
A vertically integrated Heavy Civil Contractor
Specializing in Road & Highway, Emergency Response, Railway Infrastructure, Utility Infrastructure, Alternative Energy, Airport, Environmental Remediation, and Heavy Equipment Rental
A vertically integrated Heavy Civil Contractor
Specializing in Road & Highway, Emergency Response, Railway Infrastructure, Utility Infrastructure, Alternative Energy, Airport, Environmental Remediation, and Heavy Equipment Rental
A vertically integrated Heavy Civil Contractor
Specializing in Road & Highway, Emergency Response, Railway Infrastructure, Utility Infrastructure, Alternative Energy, Airport, Environmental Remediation, and Heavy Equipment Rental
NOTABLE Clients
For over 25 years, Papich Construction has successfully served clients and agencies across California and beyond.
NOTABLE Clients
For over 25 years, Papich Construction has successfully served clients and agencies across California and beyond.
NOTABLE Clients
For over 25 years, Papich Construction has successfully served clients and agencies across California and beyond.
NOTABLE Clients
For over 25 years, Papich Construction has successfully served clients and agencies across California and beyond.
Throughout the project, Papich was faced with challenges that they were able to overcome with ease through their use of excellent communication, coordination, and decision making. Any time a problem arose it was clear that Papich aligned themselves with their client and worked to solve issues as a team rather than become adversarial. The Papich project team remained responsible, responsive, and very professional throughout the entire project.
Neel Misty
City of L.A. Dept. of Public Works
Throughout the project, Papich was faced with challenges that they were able to overcome with ease through their use of excellent communication, coordination, and decision making. Any time a problem arose it was clear that Papich aligned themselves with their client and worked to solve issues as a team rather than become adversarial. The Papich project team remained responsible, responsive, and very professional throughout the entire project.
Neel Misty
City of L.A. Dept. of Public Works
Throughout the project, Papich was faced with challenges that they were able to overcome with ease through their use of excellent communication, coordination, and decision making. Any time a problem arose it was clear that Papich aligned themselves with their client and worked to solve issues as a team rather than become adversarial. The Papich project team remained responsible, responsive, and very professional throughout the entire project.
Neel Misty
City of L.A. Dept. of Public Works
The partnering process required the project team to focus on mutual goals by asking the right questions timely to get team members to identify and act on critical issues.
Karl Mikel
Caltrans District 5
The partnering process required the project team to focus on mutual goals by asking the right questions timely to get team members to identify and act on critical issues.
Karl Mikel
Caltrans District 5
The partnering process required the project team to focus on mutual goals by asking the right questions timely to get team members to identify and act on critical issues.
Karl Mikel
Caltrans District 5
The quality and speed of work from our contractors and subcontractors has continued to amaze me. The innovation to tunnel the large 10-foot culvert allowed us to open the roadway approximately one month earlier than we could have if we installed it during fill construction.
Amy Norris
Caltrans Construction Engineer
The quality and speed of work from our contractors and subcontractors has continued to amaze me. The innovation to tunnel the large 10-foot culvert allowed us to open the roadway approximately one month earlier than we could have if we installed it during fill construction.
Amy Norris
Caltrans Construction Engineer
The quality and speed of work from our contractors and subcontractors has continued to amaze me. The innovation to tunnel the large 10-foot culvert allowed us to open the roadway approximately one month earlier than we could have if we installed it during fill construction.
Amy Norris
Caltrans Construction Engineer
SINCE
1997
25M CY
Earthwork Moved
1.9M
TONS PAVING
66 MILES
UTILITIES
500+
PROJECtS dELIVERED
Expertise. Trust. Accountability.
Papich Construction is affiliated with these well-known organizations and companies.
The LAteSt
Here’s a few notable company news items and press mentions featuring our work.
Aug 23, 2024
Sheridan Lunch & Learn
This Friday the Papich office team got out to visit where our heavy equipment is maintained and cleaned, the Sheridan Mechanics' Shop.
Jul 25, 2024
Papich Office Work Site Visit
The Papich office team went down to visit the nearby Grand Ave. road work site earlier today.
Jun 11, 2024
Papich Construction Installing Two Crossings Beneath California Highway
Papich Construction works on Californa DOT's Sonora Junction Shoulders project in Mono County.
May 22, 2024
Big Sur landslide has blocked part of Hwy. 1 for more than a year. Take a look at the work.
Caltrans and Papich Construction are working to build a new stretch of road on Hwy 1 by the end of the summer.
Aug 23, 2024
Sheridan Lunch & Learn
This Friday the Papich office team got out to visit where our heavy equipment is maintained and cleaned, the Sheridan Mechanics' Shop.
Jul 25, 2024
Papich Office Work Site Visit
The Papich office team went down to visit the nearby Grand Ave. road work site earlier today.
Jun 11, 2024
Papich Construction Installing Two Crossings Beneath California Highway
Papich Construction works on Californa DOT's Sonora Junction Shoulders project in Mono County.
May 22, 2024
Big Sur landslide has blocked part of Hwy. 1 for more than a year. Take a look at the work.
Caltrans and Papich Construction are working to build a new stretch of road on Hwy 1 by the end of the summer.
Aug 23, 2024
Sheridan Lunch & Learn
This Friday the Papich office team got out to visit where our heavy equipment is maintained and cleaned, the Sheridan Mechanics' Shop.
Jul 25, 2024
Papich Office Work Site Visit
The Papich office team went down to visit the nearby Grand Ave. road work site earlier today.
Jun 11, 2024
Papich Construction Installing Two Crossings Beneath California Highway
Papich Construction works on Californa DOT's Sonora Junction Shoulders project in Mono County.
May 22, 2024
Big Sur landslide has blocked part of Hwy. 1 for more than a year. Take a look at the work.
Caltrans and Papich Construction are working to build a new stretch of road on Hwy 1 by the end of the summer.
Aug 23, 2024
Sheridan Lunch & Learn
This Friday the Papich office team got out to visit where our heavy equipment is maintained and cleaned, the Sheridan Mechanics' Shop.
Jul 25, 2024
Papich Office Work Site Visit
The Papich office team went down to visit the nearby Grand Ave. road work site earlier today.
Jun 11, 2024
Papich Construction Installing Two Crossings Beneath California Highway
Papich Construction works on Californa DOT's Sonora Junction Shoulders project in Mono County.
May 22, 2024
Big Sur landslide has blocked part of Hwy. 1 for more than a year. Take a look at the work.
Caltrans and Papich Construction are working to build a new stretch of road on Hwy 1 by the end of the summer.
Helpful Links
© 2023 Papich Construction Co. Inc.
CA Class A License No. 767055 | CA-DIR 1000004169 • ID: RCE-56388 • ND: 49214 • NV: 0078739 • UT: 11795539-5501 • VA: 2705154065 • WA: 604-625-160
Helpful Links
© 2023 Papich Construction Co. Inc.
CA Class A License No. 767055 | CA-DIR 1000004169 • ID: RCE-56388 • ND: 49214 • NV: 0078739 • UT: 11795539-5501 • VA: 2705154065 • WA: 604-625-160
Papich Construction Co. Inc.
398 Sunrise Terrace
Arroyo Grande, CA 93420
Helpful Links
© 2023 Papich Construction Co. Inc.
CA Class A License No. 767055 | CA-DIR 1000004169
ID: RCE-56388 • ND: 49214 • NV: 0078739
UT: 11795539-5501 • VA: 2705154065 • WA: 604-625-160
Helpful Links
© 2023 Papich Construction Co. Inc.
CA Class A License No. 767055 | CA-DIR 1000004169 • ID: RCE-56388 • ND: 49214 • NV: 0078739 • UT: 11795539-5501 • VA: 2705154065 • WA: 604-625-160